wiki:ProjectMeeting/2013-02-13

Version 5 (modified by Kitson Kelly, 6 years ago) (diff)

--

Dojo 1.9

  • alpha scheduled in week (21-FEB). Anything specific to plan? Like building it on the 20-FEB to let some time do some level of sanity check testing before releasing on 21-FEB?
  • There are two blockers (enhancement not defects) on the 1.9 list that I don't think anyone is working on and that were not listed in the Dojo 1.9 plan document. Based on this I would suggest to remove the blocker status from them:

Dojo 2.0