1 | | Dojo 1.9 |
2 | | - alpha scheduled in week (21). Anything specific to plan? Like building it on the 20 to let some time do some level of sanity check testing before releasing on 21? |
3 | | - There are two blockers (enhancement not defects) on the 1.9 list (http://trac.dojotoolkit.org/query?status=reopened&status=assigned&status=new&status=open&status=pending&group=status&milestone=1.9) that I don't think anyone is working on and that were _not_ listed in the Dojo 1.9 plan document. Based on this I would suggest to remove the blocker status from them: |
| 1 | = Dojo 1.9 = |
| 2 | - alpha scheduled in week (21-FEB). Anything specific to plan? Like building it on the 20-FEB to let some time do some level of sanity check testing before releasing on 21-FEB? |
| 3 | - There are two blockers (enhancement not defects) on the [http://trac.dojotoolkit.org/query?status=reopened&status=assigned&status=new&status=open&status=pending&group=status&milestone=1.9 1.9 list] that I don't think anyone is working on and that were ''not'' listed in the Dojo 1.9 plan document. Based on this I would suggest to remove the blocker status from them: |