    11Dojo 1.9
    2   - alpha scheduled in week. Anything specific to plan?
     2  - alpha scheduled in week (21). Anything specific to plan? Like building it on the 20 to let some time do some level of sanity check testing before releasing on 21?
    33  - There are two blockers (enhancement not defects) on the 1.9 list (http://trac.dojotoolkit.org/query?status=reopened&status=assigned&status=new&status=open&status=pending&group=status&milestone=1.9) that I don't think anyone is working on and that were _not_ listed in the Dojo 1.9 plan document. Based on this I would suggest to remove the blocker status from them:
    44    - #14881