    1 Dojo 1.9
    2   - alpha scheduled in week (21). Anything specific to plan? Like building it on the 20 to let some time do some level of sanity check testing before releasing on 21?
    3   - There are two blockers (enhancement not defects) on the 1.9 list (http://trac.dojotoolkit.org/query?status=reopened&status=assigned&status=new&status=open&status=pending&group=status&milestone=1.9) that I don't think anyone is working on and that were _not_ listed in the Dojo 1.9 plan document. Based on this I would suggest to remove the blocker status from them:
     1= Dojo 1.9 =
     2  - alpha scheduled in week (21-FEB). Anything specific to plan? Like building it on the 20-FEB to let some time do some level of sanity check testing before releasing on 21-FEB?
     3  - There are two blockers (enhancement not defects) on the [http://trac.dojotoolkit.org/query?status=reopened&status=assigned&status=new&status=open&status=pending&group=status&milestone=1.9 1.9 list] that I don't think anyone is working on and that were ''not'' listed in the Dojo 1.9 plan document. Based on this I would suggest to remove the blocker status from them:
    44    - #14881
    55    - #16318
    66   
    77
    8 Dojo 2.0
     8= Dojo 2.0 =
     9 - [https://github.com/kitsonk/d2-proto/blob/master/compose.js compose] (object composition/prototyping/class candidate)
     10 - [https://github.com/kitsonk/d2-proto/blob/master/Observable.js Observable] (informed by Harmony's Object.observe)